WBS012 The Star-Spangled Banner - Smith, J. S. (PDF DOWNLOAD)

£13.99

The arranger was inspired to create this arrangement of the American national anthem during the recent presidential inauguration, having heard the new version sung at the ceremony. A trawl through YouTube, listening to many classic renditions, resulted in the need to arrange a new solo piano version, on which this arrangement is based. It uses a combination of traditional classical harmony and jazz chords to keep the sound exciting, fresh and uplifting.

Grading: 4+

Duration: 1'27

Composer: Smith, J. S.

Arranger: Pugh, A.

Instrumentation: Double Reed Band: 3 Obs, CA, 3 Bsns, Cbsn (opt.)

Listen to a sample:

 

 More payment options